Laguna Canyon Road Interchange, Orange County, California: Project Description
Special Focus
Grouting operations were conducted on a "fast-track" schedule to meet critical-path schedule project objectives. Protection of the fresh water pipeline was successfully achieved by placement of "story rods" at the pipeline's crown, and monitoring for movement with laser instrumentation. Evaluation of post-treatment relative density confirmed an average increase in "N"-values that met or exceeded prescriptive engineering objectives. The corridor project received the Consulting Engineers and Land Surveyors of California "1997 Project of the Year" . Reference: Strauss, et. al. (2004) Back to Project Profiles or Next Project Profile |
|
Navigation buttons pertain to this site's structure. Use your browser's "back" button to return to previously viewed pages. Copyright Moore & Taber, 1992, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008 ©, a wholly-owned subsidiary of AMEC, all rights reserved. Please read our Legal notice. Learn About This Web. Moore & Taber maintains the following State Contractor Licenses: Arizona: R0C169586; California: 660350 C61 (D09/D43), 793380 (A); Nevada: 0057289 (A); Oregon: CCB 147784; Utah: 5591452-5501 (E100, S262); Washington: MOORET*031P3.
|